Groundwater Well Site

A drilling rig is used to perforate 6 to 12 inch boreholes for the construction of groundwater monitoring wells. During well construction, the introduction of contaminants is minimized through the use of inert materials. Several wells located around a potential water-pollution source yields data suitable for flow, solute transport modeling, and the design of remediation strategies.

Return to Home Page


Aerocomp
P.O. Box 26109
Santa Ana, CA 92799-6109
U.S.A.

Phone (714) 964-3672
FAX (714) 964-1357